✅ CHINT 258535 – G NTE8-B Time Delay Relay – Power-On Delay, 48min–480min, AC220V
Description (English):
The CHINT G NTE8-B 258535 is a high-capacity power-on delay relay with an extended delay range from 48 to 480 minutes, engineered for long-duration control needs in industrial and environmental systems. Operating at AC220V, this device ensures reliable timing in applications such as greenhouse climate systems, ventilation delay control, or scheduled machinery startup.
Its modular design allows quick DIN rail installation, and its long delay span offers precise control over energy-intensive equipment or multi-stage operations. This relay is part of the robust NTE8-B series, known for durability and stability in demanding automation environments.
Ideal for systems where significant pre-operation buffering or energy load sequencing is required.
Specifications (English):
Model: G NTE8-B
Part Number: CHINT 258535
Operation Mode: Power-On Delay
Timing Range: 48min – 480min
Voltage Rating: AC220V
Mounting: DIN Rail
Application: Environmental control, long-delay scheduling, industrial equipment timing
Series: NTE8-B